i am working on crystal reports 9.2 and using it in asp.net. i am making graphs in it. basically it is being develped for the hospital management system. i have to show the observation of the patient for eg: pulse rate, respiration, temperature,blood pressure min and max. so the graph is made in the crystal reports. and dynamically i am giving the patient id so according to it the graph is displayed after getting values from the database(m using sql server 2000) .
SO THE PROBLEM IS::::::::::::::::
AS IN every hospital the observation is taken every four hours or five hours
for eg: at 8.00am,11.am,14,17,20,23,2,5,8am
so the graphs are shown BUT THERE IS NO DIFFERENTATION BETWEEN THE VERTICAL LINE OF 8AM OF ONE DAY TO THE 8AM OF THE NEXT DAY , IT DOESNT IT DIFFERENTLY.
SO GRAPH IS MADE WITH DATA DISPLAYED IN ORDINARY WAY.
I WANT THE VERTICAL GRID AT NEXT DAY START OBSERVATIUON A BIT THICK SO THAT IT CAN BE DISTINGUISHED EASILY..
I WANT THAT THE GRID OF THE OBSERVATION AT 8.AM AND NEXT DAY 8.AM TO BE THICK OR DIFFERNET COLOR.
PLEASEEEEEEEEEEEEEEEEEEEEEEE HELP. URGENT REQUIRED
Submit Your Article
Forum Rules

Reply With Quote